Price | RM186.00 RM349.00 |
Product SKU | 96AX2W |
Brand | Nippon Paint |
Size (L x W x H) | 140 mm x 140 mm x 180 mm |
Availability | 83 |
Quantity |
|
- Low odour, environmental friendly • Excellent adhesion on many type of substrate
NIPPON PAINT 2.5L Tile Primer Primer
Tile Primer is two component water thinned epoxy primer barrier coating designed as a universal primer coating for many types of substrate, such as glazed tiles, glazed brickwork and smooth concrete floor. It is also suitable for use as a barrier / tie coat between ideal single pack coating and two pack solvent based top coats, such as Nippon EA-4 Finish or Nippon PU Recoatable Finish.
Paint Type | Product Type | Finishing | Recommended Substrate | Pack Szie |
Water based | Interior / Exterior | Matt | Glaze tiles / concrete / masonry | 2.5 Litres, 5.0 Litres |
Composition | ||||
Pegment | White Pigment, Mineral Extender | |||
Binder | Epoxy and curing agent polymer | |||
Thinner | Water | |||
Technical Data | ||||
Drying Time |
Touch Dry : 1 hour (Dependent on temperature and humidity) Hard Dry : 4 hours (Dependent on temperature and humidity) |
|||
Recoating Time | Minimum 8 hours | |||
Curing Time (25°C to 30°C) |
7 days Drying time will become remarkably delay under low temperature. Over coating the previous coat should be done within 6 ~ 7 days but preferably as soon as possible after it has been allowed 8 hours drying or else, it is desirable to roughen it by dry sanding with sandpaper before it is over coated. This is to ensure proper intercoat adhesion. Exposure of the paint film to water, chemical and abrasion should be avoided as far as possible before full cure of the coating. When chalking occur, chalks should be removed by water washing. Allow the surface to dry thoroughly prior to over coating. |
|||
Dry Film Thickness | 35 - 40 µm per coat | |||
No. of Coats | 1 coat | |||
Theoretical Coverage |
13.1 m2 per litre per coat (for dry film thickness of 35um) 11.5 m2 per litre per coat (for dry film thickness of 40um) |
|||
Practical Coverage | 10.5 m2 per litre per coat (for dry film thickness of 35um) | |||
Volume Solid | 46% by volume (ASTM D2697 1973) | |||
Shelf Life | 2 years in tight sealed container | |||
Specific Gravity | 1.50kg/L (mixture of base and hardener) | |||
Pot-life (25°C-30°C) | 1 hour after mixing | |||
Mixing Ratio | 2.20 parts by volume of Base to 0.30 parts by volume of Hardener. Stir the content of the Base component, continue stirring and gradually add the total contents of the Hardener component, continue stirring until a homogeneous mix is obtained | |||
Recommendation Coating System | ||||
High Performance System recommended for wet areas such as bath room, wet kitchen and etc | ||||
Sealer / Primer |
Tile Primer : 1 Coat |
|||
Top Coat | Aqua Epoxy / PU Recoatable Finish / EA4 Finish : 2 Coats | |||
Conventional System only recommends for dry vertical surface | ||||
Sealer / Primer | Tile Primer : 1 Coat | |||
Top Coat | EasyWash / Odour-less AirCare / Momento Texture series / Weatherbond : 2 Coats | |||
Important note: The curing time for top coat water-based products will take longer, especially for strong colours which might take minimum 30 days to achieve full cure. In such condition, the paint film before full cure will be slightly soft and easy to develop stretch marks. Thus, we are strongly NOT recommend using any cloth or hand / finger to remove dirt marks on uncured paint film | ||||
Application Methods | ||||
Brush / Roller | Thinning is not required for brush and roll application for best result. Good quality brushes and mohair/ short nap rollers should be used with full strokes. Avoid re-brushing. | |||
Spray | Thin up 25-30% of water for conventional spray application. When airless spray is being used, excessive high tip spraying pressure should be avoided. The minimum pressure at the pump conducive with good atomisation should be used. | |||
Surface Preparation | ||||
Surfaces should be clean, dry and free from oil, grease and contaminants before painting. For previously painted surfaces, remove all unstable paint film, loose chalk, dust and foreign matter. Repair any surface defects, clean off and dry. Avoid painting on the substrate with high moisture content. Avoid painting when the environment relative humidity exceeds 85%, or when the surface to be painted is less than 3°C above the dew point. For concrete floor, the surfaces should first be degreased using an appropriate solvent or detergent solution. then mechanically abraded. All laitance must be removed by mechanical abrasion or light abrasive blasting. New concrete must have cured or a minimum of 28 days.. |
||||
Safety, Health and Environment Information | ||||
Clean up equipment with water immediately after use. |
||||
Note | ||||
* Theoretical Coverage is based on a mathematical formula
|
1 x Nippon Paint Tile Primer
1 x Hardener